
Hot-spring towns at the end of the Nagano Electric Railway: the gateway to the bathing snow monkeys of Jigokudani, the stone lanes of Shibu Onsen and the highlands of Shiga Kogen.
“经典”“游客体验”和“当地推荐”是本站编辑的选择,并非人气排名的调查结果。
A hot-spring town of narrow stone lanes and wooden inns. Staying overnight lets you visit its nine public bathhouses.
约1.5小时部分收费
巴士 · 从Yudanaka约10分钟 ・ Bus to Shibu Onsen, or about 25 minutes on foot ・ 距此2.9km
经典游客体验当地推荐
时间以9:00出发为例。移动时间按距离估算,会因候车和拥挤而变化。
9:00出发 → 约14:51结束(约6小时)
乘车约45分钟
乘车约15分钟
步行约21分钟
乘车约15分钟
Nagano Electric Railway
About 45 minutes from Nagano to Yudanaka by limited express, or about 70 minutes on local trains with a change. Trains also stop at Obuse.
Nagaden buses (Snow Monkey Park, Shiga Kogen)
From Yudanaka Station, about 10 minutes to the trailhead for the monkey park and about 40 minutes up to Hasuike in Shiga Kogen.
Express bus from Nagano Station
Some buses run direct from Nagano Station East Exit to the Snow Monkey Park and Shiga Kogen, with more services in the ski season.
“经典”“游客体验”和“当地推荐”由本站编辑挑选,并非人气排名的调查结果。所需时间仅供参考。票价、营业时间和运行日请在出发前确认官方信息。
Shibu Onsen town and its inns lit up at dusk Totti (CC BY-SA 4.0)。已裁剪并缩小。
暂无符合条件的点评。
还没有提问。可以询问前往方式、车票或行李等。
仅列出值得信赖的大型预订平台。通过这些链接预订时,本网站可能会收到介绍费(在新标签页中打开)。
The monkey park is a 30-minute walk on a forest trail. In winter it is snowy, so wear shoes with good grip.
9:00出发 → 约17:20结束(约8.5小时)
乘车约40分钟
乘车约25分钟
乘车约45分钟
Best outside the snow season. Check the time of the last bus back first.
按此顺序制定周游计划9:00出发 → 约12:50结束(约4小时)
乘车约25分钟
乘车约15分钟
步行约15分钟
步行约25分钟
On foot or by taxi from Shinshu-Nakano Station, about 10 minutes by train from Yudanaka.
按此顺序制定周游计划